Hakuba Iwatake Snow Field

The new10-seat gondola opened in December2024. Its georeferenced alignment is not in the retained licensed sources, so the retired Noah line is omitted rather than shown as the new lift. The base view focuses on source-documented WhitePlaza, not a surveyed boarding entrance. Check the official map for the current gondola.

Coverage and sources

Community-mapped terrain and infrastructure support planning; check the operator for current access and opening. The terrain rectangle includes surrounding context and is not an operating boundary. Historical terrain does not show current snow or glacier surfaces. Building details, heights, trees, lift vehicles and light are illustrative; source footprints remain unchanged.

Woodland positions and dimensions are illustrative within retained native woodland masks.

SRTM terrain data courtesy of the U.S. Geological Survey. Via Mapzen/Tilezen. Source retrieval times are retained per tile; survey dates remain unknown. Terrain Tiles: https://registry.opendata.aws/terrain-tiles.

© OpenStreetMap contributors · ODbL. OpenSkiData / OpenSkiMap.org, Skimap.org, Who’s On First, © Mapterhorn. Source-family licences, historical metadata and sampling details remain in terrain.json.

Official resort information and trail maps ↗

Geographic source archive index · Selected ski-source database

Contains selected complete building polygons from the Geospatial Information Authority of Japan vector-tile trial, processed by MtnPow from tile coordinates to WGS84. Source vertices and courtyard holes are preserved. Publisher dataset update: July2026; individual observation dates remain unknown. PDL1.0 / CC BY4.0-compatible terms. These source layers retain their separate licence. Government building-source index and original tiles.